Get in Touch
Have any Questions?(+44) 0208 152 4509

Armoured catfish Sundaland noodlefish crappie powen, squawfish crocodile icefish sleeper shark.

Contacts

Location
523 Sylvan Ave, 5th Floor
Mountain View, CA 94041USA
Phone
+1 234 719 8948
+1 987 654 3210

Follow us

Project Details

Falmouth, Atlantic & Peninsula clean shore power future

Marine Zero has partnered with A&P Falmouth to reduce emissions in port by providing sustainable clean shore power solutions to vessels after it was successful in a bid to the UK Government’s Zero Emission Vessel Infrastructure fund (ZEVI).

A&P Falmouth is part of APCL Group, the global ship building and ship repair organisation.

The facility is one of the world’s largest natural deep-water harbours, with large graving docks and extensive along-side deepwater berthing. A&P Falmouth provides vital ship repair and in-service support to the Royal Navy and Royal Fleet Auxiliary.

The £12m shore power project will see A&P Falmouth provide the UK’s first multi-vessel flexible shore power connections on Cornwall’s Atlantic Peninsula in partnership with engineering design specialist Marine Zero. As well as reducing CO2 emissions, the technology will also reduce noise in port.

The Falmouth, Atlantic & Peninsula Clean Shore Power Future project is part of the Zero Emissions Vessels and Infrastructure competition (ZEVI), which was announced in February 2023, funded by UK Government and delivered in partnership with Innovate UK.

As part of ZEVI, the Department for Transport allocated over £80m to 10 flagship projects supported by 52 organisations from across the UK to deliver real world demonstration R&D projects in clean maritime solutions. Projects will take place in multiple locations from the Orkney Isles to the Southwest of England.

A&P Falmouth has partnered with Marine Zero for the design and specification of the multiple 1.5MVA shore power systems.  The project will be scalable to meet future increased capacity demands of larger vessels and additional connections at A&P Falmouth. Work is already underway and is expected to be completed by Q1 2025.

A&P Falmouth - ZEVI Project