ZEPHR, funded through the ZEVI competition, leads the way to a net zero future. The project encompasses the design, manufacture and operation of a green hydrogen fuelled Uncrewed Surface Vessel (USV), to be operated on the River Thames in London, and local green hydrogen production and storage.
ZEPHR aims to extend vessel operation ranges for port operators and stakeholders through complete energy transferal, from readily accessible green electricity to 100% green hydrogen production, compression, storage and dispensing.
The project runs from 1 October 2023 to 31 March 2025 and will be followed by a vessel demonstration period of at least three years in an operational environment.